WELCOME TO DILEIGH CONSULTING ENGINEERS
Dileigh Consulting Engineers Pty Ltd (Dileigh) is a civil and structural engineering consultancy that provides a wide range of technical-based engineering support services for civil and structural construction contractors and local government authorities.
Our area of expertise is in the civil and structural construction industry, providing a complete range of services and solutions for all stages of your project lifecycle from planning, conceptualisation, detailed design and documentation, through to asset handover and lifecycle management.
Dileigh has a proven track record of meeting and exceeding our clients’ expectations with economical and practical design solutions, which are uniquely tailored to suit the expectation of the client and site constraints.
Every member of Dileigh’s team is committed to providing high-quality service that adds value to your projects through smart, innovative engineering.
PROJECTS
PACIFIC OUTLOOK ESTATE
90 lot residential subdivision - project management and engineering supervision.
90 lot multiple staged residential sub division
Preparation of construction cost estimate and contract documentation for tender purposes
Review and make recommendation on suitable contractors
Engineering supervision
Contract management
As constructed submission and certification
Local authority liaison
CLERMONT NORTH
30 lot industrial subdivision - operational works design and engineering supervision. Ongoing multi staged development.
30 lot industrial subdivision with B-double access Clermont, Queensland
Preparation of Stormwater Management Plan including MUSIC modelling
Traffic impact assessment and road network impact assessment to GARID
Design and documentation of stormwater drainage network
Design and documentation of stormwater basin and bio-infiltration treatment facility
Design and documentation of roads and site earthworks
Design and documentation of intersection with Gregory Highway (statecontrolled road) for type 2 road train access
Preparation of environmental, sedimentation and erosion management plans
Preparation of construction cost estimate and contract documentation for tender purposes
CANOME ESTATE ON TANBY
50 lot park residential subdivision - operational works design and documentation.
50 lot park residential subdivision, Tanby Queensland
Preparation of Stormwater Management Plan including MUSIC modelling
Design and documentation of stormwater drainage network
Design and documentation of detention basin and bio-infiltration treatment facility
Design and documentation of roads, drainage swales and site earthworks
Design and documentation of gravity sewer network
Preparation of Environmental, Sedimentation and Erosion Management plans
Preparation of construction cost estimate and contract documentation for tender purposes
BOC GAS & GEAR ROCKHAMPTON
Operational works and structural design & documentation.
4,000m² commercial development on contaminated land
Structural design and documentation of structural reinforced concrete structure
Preparation of Stormwater Management Plan
Design and documentation of underground stormwater pipe network
Site earthworks design and documentation to achieve a cut/fill balance of 0, whilst excavating 500mm of contaminated material from areas to be landscaped
Preparation of Environmental, Sedimentation and Erosion Management plans
Preparation of operational works cost estimate, application documentation and administration of application process
KENT STREET RECONSTRUCTION
Design and documentation - North Street to Albert Street.
Reprofiling, stabilisation and drainage upgrade of Kent Street, Rockhampton
Assessment of existing drainage system
Design upgrade of existing drainage system
Design and document for pavement profiling and stabilisation including kerb and channel replacement where required
Construction cost estimates
UPPER DAWSON ROAD DRAINAGE UPGRADE
Wiseman Street to Bruce Highway.
Drainage investigation to identify required drainage system upgrades
Assessment of existing drainage system
Design upgrade of existing drainage system
Design and document trunk drainage upgrade
Construction cost estimates
MOSTYN STREET DRAINAGE UPGRADED
Mostyn Street to Frenchman’s Creek.
Drainage investigation to identify required drainage system upgrades
Assessment of existing drainage system
Design upgrade of existing drainage system
Design and document trunk drainage upgrade
Construction cost estimates
YEPPOON TENNIS DEVELOPMENT
Project management.
8 Tennis Courts and Associated Infrastructure including $550,000 Clubhouse
Project management for construction phase
Superintendent’s representative, contract administration
Stakeholder consultation
RICHMOND STREET UNITS
Operational works design, documentation and supervision.
Multiple unit development
Preparation of Stormwater Management Plan including MUSIC modelling
Operational works design and documentation
Application management
Engineering supervision of earthworks, access works and drainage
As constructed submission and compliance
Local government liaison
CHARLES STREET UNITS
Operational works design, documentation and supervision.
Multiple unit development
Structural design and documentation of two-storey multi-unit structure
Preparation of Stormwater Management Plan including MUSIC modelling
Operational works design and documentation
Application management
Engineering supervision of earthworks, access works and drainage
As constructed submission and compliance
Local government liaison
LUCAS STREET WASTE TRANSFER FACILITY
Waste Transfer Facility, Gracemere.
Redevelopment of exhausted quarry site to construction and demolition waste transfer facility and landfill
Preparation of traffic impact assessment on local road network
Preparation of storm water management plan including MUSIC modelling
Preparation of site waste acceptance policy
Preparation of operational works application documentation and administration of application process
Site based operational management plan and procedures
CAIRNS AND ROCKHAMPTON DIRECT FREIGHT DEPOTS
Material change of use and operational works design and documentation.
Commercial road freight depot developments
Non-impact assessable material change of use application reports
Preparation of Stormwater Management Plan including MUSIC modelling
Design and documentation of underground stormwater pipe network
Site earthworks design and documentation to achieve a 0 cut/fill balance
Preparation of Environmental, Sedimentation and Erosion Management plans
Preparation of operational works cost estimate, application documentation and administration of application process
Operational works supervision
BOULDERCOMBE GRANITE QUARRY
Engineering planning, traffic and access design.
Development of a greenfield site for a 100,000 ton extraction operation
Preparation of traffic impact assessment on local road network
Preparation of road impact assessment on surrounding road network
Preparation of Stormwater Management Plan including MUSIC modelling
Transport and main roads liaison
Development of schematic design
Design and documentation of quarry access with state controlled road
Site based Operational Management Plan and extraction plan
BOUNDARY ROAD COMMERCIAL DEVELOPMENT
Material change of use, operational works and structural design and documentation controlled road.
Redevelopment of existing commercial site including a new 1260m² showroom/workshop facility, and additions to an existing steel portal frame workshop and showroom
Structural design and documentation of structural reinforced concrete structure
Preparation of Stormwater Management Plan including MUSIC modelling
Design and documentation of underground stormwater pipe network
Site earthworks design and documentation
Preparation of Environmental, Sedimentation and Erosion Management plans.
Preparation of operational works cost estimate, application documentation and administration of application process
Verify your listing to gain access to leads, update your profile and add more services and machines.
Verify Now