Driveways, Land reshaping, Drainage Work as a Postitrak operated for over 4 years,excavator operator over 7 years, Main Postitrak operator on the Bega bypass (1year) then onto manage all stormwater drainage at the new Bega hospital and associated works,final trim with excavator and positrack